Project Background
Sinopec Petroleum Engineering Corporation undertook the surface gathering, transportation, and utilities scope of the Leikoupo Formation gas reservoir development project in the West Sichuan Gas Field.
The project included a produced water stripper skid for vapor-phase separation. The skid used Fisher single-seat control valves requiring reliable smart valve positioners for process control.